December 2023 - March 2024 |
|
Accomplishments: |
Structure Builds:
Miscellaneous:
|
Updated Track Plan |
|
A Short Video A 21-car train backing through the hand-laid double crossover, pushed by the re-motored Mantua Mikado. |
|
Structure Builds |
|
Timberline Produce Warehouse as "S&P Witt Butter Eggs Milk Poultry" |
|
Timberline Produce Warehouse as "S&P Witt Butter Eggs Milk Poultry" |
|
Suydam Industrial Offices as "Reardon Steel Ore Processing Office" |
|
RailroadKits "Dannen Feeds" |
|
RailroadKits "Dannen Feeds" |
|
Railroad Line Models Freight Interchange Loading Dock for the wharf team track |
|
Railroad Line Models Freight Interchange Loading Dock for the wharf team track |
|
Conowingo Models Neil's House, modified with a freight door |
|
Conowingo Models Neil's House, modified with a freight door |
|
Tichy milk station for the branch line |
|
Scenery Work |
|
Lighting added to the wharf, background sky panel installed |
|
Structures in place, backgrounds installed |
|
Ground cover, foliage added to west side branch line |
|
wider view, also showing the ITLA loading dock for Incorporated Tool |
|
East side scenery update |
|
Card Car Boxes |
|
Whitby Boxes |
|
Whitby Yard Boxes |
|
Devils Camp Boxes |
|
Rockdale Terminal Boxes |
|
Rockport / Barge Boxes |